Chittagong Port Bay Terminal Masterplan

Chittagong Port Bay Terminal Masterplan

Project Overview

01. Review & Update Feasibility Study:
Review existing feasibility study 2017, Perform necessary surveys, analyze, calculate and update Feasibility Report.
02. ESIA Study:
The project, perform necessary surveys and social consultation and prepare a ESIA Study report for World Bank.
03. Detailed Masterplan:
Preparing Detailed masterplan for 5km long Terminal Area. Including Two Container Terminals and One Multipurpose Terminal. Key Features are Jetty, Container Yard, Multipurpose Yard, Delivery Yard, Warehouses, Fire Safety and other related facilities.
04. Construction Supervision:
Upcoming Task, when Construction starts.

Client
Chittagong Port Authority
Location
Chittagong, Bangladesh
Category
Sea Port Masterplan Design
Planning
Project Area
780 Acre